Skip to content.

ByExample.com

Sections
Personal tools
You are here: Home » Library » Photographs » Project Photos » Installing Our Homestead Utilities

Installing Our Homestead Utilities

Up one level
Installing our solar powered submersible well pump, 1600 gallon water storage tank, Pex water lines, septic, phone and data lines. Photos Summer 2007.
The Water Tank Arrives
 
Unloading the Water Storage Tank
 
Rain While Installing the Water Tank
 
Trenching for Water Lines
 
The Water Tank in Place
 
More Trenches
 
Running Pex Water Lines
 
Water Lines to the Future Greenhouse
 
Pit for Water Distribution Center
 
Fresh Water Intake on Storage Tank
 
Creating the Water Distribution Center
 
Running Data Lines to the Utility Shed
 
Running the Phone Line to the Utility Shed
 
Lines Running into the Future Utility Shed
 
More Fresh Water Pex Lines
 
Water Manifold
 
Pex Tubing Tools
 
Pex Water Lines and Fittings
 
Pex Crimper
 
Checking the Pex Crimp
 
Another Pex Connection
 
Completed Pex Joint
 
Pipe, Rope and Wire for Well Pump
 
Sun Pumps Submersible Well Pump
 
Wiring the Pump
 
Splicing Wires to the Well Pump
 
Water Proof Splice Kit
 
Sealing the Wire Splice
 
Submersible Well Pump Ready to Install
 
Installing the Submersible Well Pump
 
Lowering the Pump into the Well
 
Only 100 Feet To Go
 
Only 50 Feet To Go
 
Submersible Pump Lowered to 140 Feet
 
Solar Panels to Power Well Pump
 
Dedicated 24V Solar Power System for Pumping
 
1600 Gal Water Storage Tank
 
Utility Shed Construction
 
Utility Shed - First Structure on Our Property
 
Water Tank & Utility Shed
 
Planning Out Septic Lines
 
Laying Septic Lines
 
ABS Pipe for Septic Lines
 
Septic Lines During Installation
 
Septic Tank
 
Sawing the ABS
 
Glueing the ABS Pipe Joints
 
Septic Plumbing for a Toilet
 
Septic Clean Out Pipe
 
Utility Shed with Solar Panels
 
Google
 
Web www.ByExample.com
Our Email Newsletter

To subscribe please enter your e-mail address below.


Past Newsletters

 
 
 

Google